Quantcast kitchen redo
 
INTERCOT: Walt Disney World Vacation Planning Guide Walt Disney World Disney Cruise Line Mousehut Mail WebDisney News INTERCOT: Walt Disney World Vacation Guide
News Discussion Theme Parks Resorts Info Central Shop Interactive Podcast INTERCOT Navigtion
Site Sponsors
  magical journeys travel agency
  INTERCOT shop

INTERCOT Affiliates
  disney magicbands & accessories
  disneystore.com
  disney fathead
  disney check designs
  amazon.com
  priceline.com

News
  site search
  headlines
  past updates
  discussion boards
  email update

INTERCOT Other
  advertising
  sponsors
  link to us
  contact us
     

INTERCOT Ads
 

 
 

Results 1 to 14 of 14

Thread: kitchen redo

  1. #1
    Join Date
    Dec 1999
    Location
    va beach, va usa
    Posts
    1,390
    Post Thanks / Like

    Default kitchen redo

    Has anyone redone their kitchen lately? We have been searching for a new house for over a year with no luck. So we have decided to stay where we are, update the kitchen and floors and make the move after our youngest is out of school. She is now in the 10th grade.

    I believe that I have found a great price but I am very nervous about how long they will take. They keep telling me less than a month and I am praying they are correct. My neighbors added on to their house and their kitchen was down for 6 months. I cannot do that.

    We are not making any structural changes but we are pulling out the tile, putting in hardwood, putting new cabinets in the old foot print, granite and a new backsplash.

    Any coping techniques or ideas to make this easier?

  2.     Please Support INTERCOT's Sponsors:
  3. #2
    Join Date
    Jul 2003
    Location
    At the Edge of Reason
    Posts
    12,581
    Post Thanks / Like

    Default

    Demo is quick, if you're not saving anything. We had custom cabinety made and it took a couple of weeks. Off the shelf stuff is easier. Granite shouldn't measured until the cabinets are in and may take a week or so. Backsplash goes in last and our took a couple of days.

    A month sounds about right. If it were me...

    Had the kitchen wired for undercabinet lighting. Make sure your electrical is up to par, NOW is the time to add recepticles.

    FInally, think about venting your exhaust through the roof as well, not back out into the kitchen. You can hide the venting with cabinetry.

    Just a couple things to think about.

  4. #3
    Join Date
    Feb 2004
    Location
    Lafayette, Louisiana
    Posts
    6,624
    Post Thanks / Like

    Default

    My parents did a kitchen reno about two years ago. They did pretty much what your planning. It took about a month. Good luck and I hope it all turns out the way you want.
    Denise

    Resorts we've stayed at in 20+ trips: ASMo, ASMu, ASSp, PC, CSR, CBR, POR, POFQ, WL, AKL Jambo, AKL Kidani, Poly, Contemporary, BC, YC, BWV, OKW, SSR, Swan, Shades of Green, Vero Beach, Disneyland Resort

    Next Trip: ???

  5. #4
    Join Date
    Sep 2007
    Posts
    510
    Post Thanks / Like

    Default

    We did our kitchen a couple of years ago. Granite done in a week. The installer made a template and installation took a day. We did the backplash ourselves, tumbled marble in a day. Didn't do the cabinets. Best wishes, hubby did construction for a while and said it always takes longer than you expect.

  6. #5
    Join Date
    Jan 2007
    Location
    Beachwood, NJ
    Posts
    2,539
    Post Thanks / Like

    Default

    We did our kitchen last spring and it took about a month. We did exactly what you're planning, because it made more sense to do the hardwood first, then the cabinets and the countertop. We were absolutely without a kitchen for a solid couple of weeks--ordered a lot of take out, used the bathroom sink for washing coffee cups. Set the fridge on the back deck (LOL fortunately it was April!) and the coffeepot in the spare bedroom. We were horribly inconvenienced, but my kitchen is very pretty now--and much more functional than it had been.

    To me, there seemed to be a lot of "hurry up and wait." If one thing is off, or if one cabinet arrives and is incorrect, it sets the whole project back. While overall I'm pleased with our kitchen, I was very disappointed in the quality of the work and would never recommend the company we used.

    DH did all the demo himself, and the backsplash, too--which can really be done at any time after the cabinets & counter are put in.

    Ooh, make sure they measure the granite so that the seam is in the middle of your sink.
    Christi


    2014: May--POR & US/IOA; Nov--POR (1st rD--JJ5k!)
    2013: May--POR
    2012: Jun--POP; Aug--POP/Hard Rock
    2011: Aug/Sept--US/IOA; Nov--POFQ
    2010: Dec--CSR
    2009: Sept--Poly GVCL
    2008: Sept--POFQ
    2007: Jan/Feb--POR; Sept: POFQ
    2004: Oct--CSR
    1987: off-site

  7. #6
    Join Date
    Jul 2006
    Location
    no longer in Oceanport, New Jersey (sad)
    Posts
    1,833
    Post Thanks / Like

    Default

    Make sure that they don't throw away your old countertops when they take out the old cabinets. You can use the old counters over the new cabinets until your new counters are ready, so your kitchen can be marginally functional while you wait for the counters. Then they can haul away your old counters when the new counters are installed.
    Amanda
    Mom of Jay and Sam

    'Please stand clear of the doors. Por favor
    mantengase alejado de las puertas'


    CR - Jun 76, 85 & 89
    BLT - Nov 11 & 13
    Poly - Jun 80 & Jan/Feb 07
    WL - Jun 97, Sep 05 & Dec 08
    Next - Jersey Week 2015 Baby!

  8. #7
    Join Date
    Mar 2006
    Location
    Maine
    Posts
    2,029
    Post Thanks / Like

    Default

    My husband and I own a construction company and that time frame sounds about right. Just keep in mind that whenever you are ripping anything apart there can be hidden problems that come up that the contractor won't know about until he gets stuff ripped out. There is alot of hurry up and wait in the construction business. You are not just worrying about your own schedule but the schedule of your subcontractors who have other projects going at the same time. It takes time but will be worth it in the end. I agree that now is the best time to do any electrical updating.
    Tinkerfreak
    oct./nov. 2002-AKL
    oct./nov. 2003-WL
    nov. 2004-AKL
    oct./nov. 2005-AKL
    Dec. 2006 BC
    April 2007 AKL
    oct./nov. 2007 AKL/Poly
    oct./nov. 2008 POFQ/AKL
    Nov. 2009 CBR
    May 2010 BW

  9. #8
    Join Date
    Aug 1999
    Location
    East Lake Tohopekaliga, FL (Saint Cloud)
    Posts
    13,855
    Post Thanks / Like

    Lightbulb

    Quote Originally Posted by diz_girl View Post
    Make sure that they don't throw away your old countertops when they take out the old cabinets. You can use the old counters over the new cabinets until your new counters are ready, so your kitchen can be marginally functional while you wait for the counters. Then they can haul away your old counters when the new counters are installed.
    That's exactly what we did when we overhauled our kitchen about 3 years ago. We had totally gutted the room, and after laying the floor, installing the cabinets on the old footprint and having the new countertops templated, we put the old one in place until the granite arrived a few days later. We were doing all the work ourselves (except the granite), and had estimated a month, doing most of the work on our days off, and it ended up being more like 6 weeks. Lots of carry-out, pizza deliveries, and microwave meals and doing dishes in the bathtub, but in the end it was 100% worth the inconvenience.
    Ed
    Senior Imagineer Emeritus

    Welcome to the INTERCOT forums !


  10. #9
    Join Date
    Sep 2005
    Location
    Ajax, ON (1,325 miles from Disneyworld)
    Posts
    7,471
    Post Thanks / Like

    Default

    Quote Originally Posted by diz_girl View Post
    Make sure that they don't throw away your old countertops when they take out the old cabinets. You can use the old counters over the new cabinets until your new counters are ready, so your kitchen can be marginally functional while you wait for the counters. Then they can haul away your old counters when the new counters are installed.
    ALSO, Habitat for Humanity has RE-Stores that will take donations such as previously used kitchen counters and cabinets, even knobs and face plates for electrical outlets or light fixtures! They then put these things for sale in their RE-Stores and they get some money, you get rid of your junk and someone else finds something they are looking for at a reduced rate!!!

    Good luck with your redo!
    Jennifer (aka Mickey'sGirl)
    INTERCOT Staff: Guests with Special Needs, Dining and Disney Characters

    Last trip: March 2016 - Fantasy
    Next trip: Aug 2017 - Aulani

    I am a Galactic Hero once more!

  11. #10
    Join Date
    Jul 2008
    Location
    West Allis, WI
    Posts
    473
    Post Thanks / Like

    Default

    I would also put in new plumbing and shut off valves to the sink..we put in two walls of cabinets in a weekend. Working from the corner out with the upper first, it was pretty quick. A level, straight edge, and drill were about all we needed. Don't forget shims. (make sure you use phillips head screws if doing this yourself, much easier on the knuckles ).
    1986 and 1991 offsite
    1998,2000,2001,2003,2004,2006,2008 movies
    1999, 2002 sports
    2005, 2007, 2009, 2011 pop
    2008 Riverside (Christmas Parade)
    2010 CB (25th anniversary)

  12. #11
    Join Date
    Dec 1999
    Location
    va beach, va usa
    Posts
    1,390
    Post Thanks / Like

    Default

    Thanks for the feed back. I like the ideas of waiting to haul the countertop and donating to Habitat for Humanity.

    We start picking cabinets in the morning!

  13. #12
    Join Date
    Sep 1999
    Location
    springfield, PA, USA
    Posts
    2,601
    Post Thanks / Like

    Default

    Ours is taking about a month. Two weeks for the quartz countertop. Delayed because during the demo of the floor there was asbestos underneath, and I'm sure the neighbors are wondering about those big biohazard signs in the windows
    SteveL

  14. #13
    Join Date
    Feb 2009
    Location
    San Francisco Bay Area
    Posts
    1,012
    Post Thanks / Like

    Default

    I just finished pretty much the same thing as you are doing. I'd say a month sounds about right from the time of demo to completion - at least as along as they don't find any problems that need to be fixed. It took two weeks for my cabinets to come in and that's when I tore out what I had. Putting in the new cabinets took three days. That was when the granite was measured, and that was the biggest delay before they put it in. I put in my flooring after the cabinets were in so was able to use my kitchen before that part was finished.
    Aryn

    I am the rebel spy.

  15. #14
    Join Date
    Mar 2011
    Location
    Kissimmee FL
    Posts
    58
    Post Thanks / Like

    Default

    We redid a kitchen and really missed home cooking. I would recommend cookin a bunch of meals and freezing them. You can hook up a microwave any where in the house and you will have dinners all ready.
    X2 flight sim specialist at Mission:Space stop by and see me!

    Addicted to Pin trading!!!

Share This Thread On Social Media:

Share This Thread On Social Media:

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  

 
Company
Advertising
Guest Relations
Community
Discussion Boards
Podcast
Newsletter
Shop
Social
Facebook
Twitter
Instagram
YouTube
Pinterest
Subscribe to our Newsletter
Enter your email address below to receive our newsletter:
INTERCOT Logo PRIVACY STATEMENT / DISCLAIMER | DISCUSSION BOARD RULES
© Since 1997 INTERCOT - a Levelbest Communications Website. This is not an official Disney website.
> Levelbest Network Site